Attic joist cutter. Nail 12d nails through the headers into the ends of the cut joist. Always cover the tops of the ceiling joists to make sure the insulation is deep enough to reach your target r value and to prevent thermal bridging the heat loss that occurs through the wood framing. Check each joist for crowning slight bowing along the length of the board and mark the top edge to ensure that the joist is installed with the crown facing up. Cut 2 joist sized boards long enough to span two joists on each side of your chosen location see figure 9.
Modifying an attic floor s joist system is a job for the pros. The rim joist fig. Step 3 nail joist support boards. Use of joists in attic flooring.
It is very easy to over cut the notches and remove the waste in two swift cuts but over cutting the notches in this manner weakens the structural integrity of the replacement lumber. Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall. Covering the ceiling joists in the attic using plywood is a cheap way to make better use of the wasted space in your house. In situations when sistering damaged floor joists with lumber of similar dimensions it can be easy to notch and slide the sister board into place.
Set a hydraulic jack and post under the beam and jack up the joists about 1 8 in. Yes you can typically cut through joists but you must make some additions known as trimmers and headers to the framing as well. Work from the perimeter of the attic toward the door or hatch so that you don t trample all over the insulation you just put in. Cut new joist lumber for each of the sister joists using a circular saw.
The subfloor installation is easy. A day until they re level. After you ve cut and boxed the ceiling joists proceed to make a platform or. Then set new joists same height as existing ones alongside the old.
Precise measurement is the most difficult as you need to consider all underlying obstructions carefully before proceeding with your plans. Tack a beam under the sagging joists. Bridging involves cutting new wood members and installing them perpendicularly between the existing joists. The ceiling joists will not hold much weight being only 2x4 s.
These boards will support the joists that will be cut and help keep the ceiling from sagging or completely collapsing while you are working in the overhead space.